Sunday, November 15, 2015

Update: Nov. 15, 2051

Apache Junction, AZ   H72   L53

The past two weeks Judy and I have continued to be mostly occupied with the final phase of our house construction project.  We have met with various vendors lining up follow on projects once we take possession around Thanksgiving.

In the last two weeks, all countertops have been installed, light fixtures and ceiling fans are in, the plumbing fixtures have been installed and major appliances have also been put in. The floors have been finished with tile or carpet and all bath vanities have been installed and all tile work has also been completed in both bathrooms.

Judy and I purchased a refrigerator and washer and dryer this week. Delivery will be after the closing. We contracted with a landscape firm for our yard’s transition. Landscape design is much different than what we are familiar with. After all, this is a desert area.  We also had time to do some fun things too.

Here are a few update pics

cabinetsB     cuntertops2B

foyer     House front 1

Yolanda, a Sears sales rep was a huge asset to Judy and I as we shopped for a refrigerator and washer and dryer.

yolonda 

That is all for now. Thanks for stopping by.

Next Blog: in a week or so

PS. Judy and I will be returning for our third season at Pelton Park in Madras, Oregon.

5 comments:

  1. When you get settled, and us too, we'll be out! Your place looks great!

    ReplyDelete
  2. It is really coming together and is beautiful.

    ReplyDelete
    Replies
    1. Thanks, Sandie. Let us know when yall get back here.

      Delete